Panchayat:Repo18/vol2-page0360: Difference between revisions
Nandakumar (talk | contribs) (''''COASTAL REGULATIONZONE NOTIFICATION, 2011''' 359<br> {| class=wikitable |- | 1.19 || Production and manufacturing proce...' താൾ സൃഷ്ടിച്ചിരിക്കുന്നു) |
No edit summary |
||
Line 4: | Line 4: | ||
| 1.19 || Production and manufacturing processes? || || | | 1.19 || Production and manufacturing processes? || || | ||
|- | |- | ||
| 1. | | 1.20 || Facilities for storage of goods or materials? || || | ||
|- | |- | ||
| 1.21 || Facilities for treatment or disposal of solid waste or liquid effluents? || || | | 1.21 || Facilities for treatment or disposal of solid waste or liquid effluents? || || | ||
Line 24: | Line 24: | ||
| 1.29 || Abstraction ortransfers of Waterform ground or surface waters? || || | | 1.29 || Abstraction ortransfers of Waterform ground or surface waters? || || | ||
|- | |- | ||
| 1. | | 1.30 || Changes in Water bodies or the land surface affecting drainage or run-off? || || | ||
|- | |- | ||
| 1.31 || Transport of personnel or materials for Construction, operation or decommissioning? || || | | 1.31 || Transport of personnel or materials for Construction, operation or decommissioning? || || | ||
Line 42: | Line 42: | ||
2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short Supply): | 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short Supply): | ||
{{ | {{Create}} |
Revision as of 08:23, 2 February 2018
COASTAL REGULATIONZONE NOTIFICATION, 2011 359
1.19 | Production and manufacturing processes? | ||
1.20 | Facilities for storage of goods or materials? | ||
1.21 | Facilities for treatment or disposal of solid waste or liquid effluents? | ||
1.22 | Facilities for longterm housing of operational workers? | ||
1.23 | New road, rail or sea traffic during Construction or operation? | ||
1.24 | New road, rail, air Waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? | ||
1.25 | Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? | ||
1.26 | New Ordiverted transmission lineS Or pipelines? | ||
1.27 | Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? | ||
1.28 | Stream and river crossings? | ||
1.29 | Abstraction ortransfers of Waterform ground or surface waters? | ||
1.30 | Changes in Water bodies or the land surface affecting drainage or run-off? | ||
1.31 | Transport of personnel or materials for Construction, operation or decommissioning? | ||
1.32 | Long-term dismantling or decommissioning orrestoration works? | ||
1.33 | Ongoing activity during decommissioning which could have an impact on the environment? | ||
1.34 | Influx of people to an area in either temporarily or permanently? | ||
1.35 | introduction of alien species? | ||
1.36 | Loss of native species or genetic diversity? | ||
1.37 | Any other actions? |
2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short Supply):
ഈ താൾ 2018 -ലെ പഞ്ചായത്ത് റെപ്പോ നിർമ്മാണം യജ്ഞത്തിന്റെ ഭാഗമായി സൃഷ്ടിച്ചതാണ്. |