Panchayat:Repo18/Law Manual Page0813: Difference between revisions

From Panchayatwiki
('Rule 102 THE KERALA PANCHAYAT BUILDINGS RULES, 2011 813 (b) Number of floors shall be limited to two & a stair room; (c) T...' താൾ സൃഷ്ടിച്ചിരിക്കുന്നു)
 
No edit summary
 
(10 intermediate revisions by the same user not shown)
Line 1: Line 1:
Rule 102
 
THE KERALA PANCHAYAT BUILDINGS RULES, 2011
 
813
(b) Number of floors shall be limited to two & a stair room;
(b) Number of floors shall be limited to two & a stair room; (c) The minimum distance between buildings shall not be less than 1.50 metres; (d) Minimum front open space of 1.50 metres shall be provided exclusively for each unit;
 
(c) The minimum distance between buildings shall not be less than 1.50 metres;  
 
(d) Minimum front open space of 1.50 metres shall be provided exclusively for each unit;
 
(e) A toilet shall be provided for each unit; with necessary leach pit or septic tank, which may be common.
(e) A toilet shall be provided for each unit; with necessary leach pit or septic tank, which may be common.
100. In the case of construction/developments other than huts made by Tribal people in their land inside or outside a cluster of houses/settlement; the Panchayat may provide necessary assistance and guidelines so as to conform to the guidelines in the Rule 99, and also give necessary technical and infrastructural support as far as possible; and number the houses.
100. In the case of construction/developments other than huts made by Tribal people in their land inside or outside a cluster of houses/settlement; the Panchayat may provide necessary assistance and guidelines so as to conform to the guidelines in the Rule 99, and also give necessary technical and infrastructural support as far as possible; and number the houses.
CHAPTER XVI
 
RAIN WATER HARVESTING 101. Groundwater recharging arrangements.- (1) Unless otherwise stipulated specifically in a Town Planning Scheme, workable groundwater recharging arrangement shall be provided as an integral part of all new building constructions through collection of rooftop rainwater:
 
<div class="center" style="width: auto; margin-left: auto; margin-right: auto;">'''CHAPTER XVI'''</div>
 
<div class="center" style="width: auto; margin-left: auto; margin-right: auto;">'''RAIN WATER HARVESTING''' </div>
 
'''101. Groundwater recharging arrangements.-''' (1) Unless otherwise stipulated specifically in a Town Planning Scheme, workable groundwater recharging arrangement shall be provided as an integral part of all new building constructions through collection of rooftop rainwater:
 
 
Provided that, the groundwater recharging arrangements are not mandatory for thatched buildings and for single family residential buildings if the total floor area is upto 150 sq.metres and if the total plot area is upto 320 sq.metres;
Provided that, the groundwater recharging arrangements are not mandatory for thatched buildings and for single family residential buildings if the total floor area is upto 150 sq.metres and if the total plot area is upto 320 sq.metres;
(2) The components of workable groundwater recharging arrangements as stipulated in sub rule (1) above, shall include:
(2) The components of workable groundwater recharging arrangements as stipulated in sub rule (1) above, shall include:
(i) Roof gutters (ii) Down pipe (iii) Filter unit (iv) Recharge well or Recharge pond or Percolation pit:
 
 
(i) Roof gutters
 
(ii) Down pipe
 
(iii) Filter unit  
 
(iv) Recharge well or Recharge pond or Percolation pit:
 
Provided that, open well or pond within the plot can be used as recharge components as mentioned in item (iv) above:
Provided that, open well or pond within the plot can be used as recharge components as mentioned in item (iv) above:
Provided further that, filter unit as mentioned in item (iii) shall be mandatory only in situations where rainwater is recharged directly to the groundwater through open wells, ponds and the like.
Provided further that, filter unit as mentioned in item (iii) shall be mandatory only in situations where rainwater is recharged directly to the groundwater through open wells, ponds and the like.
yo (3) In exceptional cases such as water logging or impermeable subsoil conditions to considerable depths, the groundwater recharging arrangements for building constructions need not be made mandatory.
(3) In exceptional cases such as water logging or impermeable subsoil conditions to considerable depths, the groundwater recharging arrangements for building constructions need not be made mandatory.
(4) The owner(s)/occupier(s) shall maintain the rooftops and the groundwater recharging arrangements in healthy working condition. EDET 102. Rainwater storage Arrangements.- (1) Unless otherwise stipulated specifically in a Town Planning Scheme, workable rainwater storage arrangements shall be provided as an integral part of all new building constructions through the collection of rooftop rainwater for the following occupancies, namely:78 (i) Group A1 Residential (In the case of single family residential buildings, if
 
the total floor area of the building is upto 150 sq.metres and if the plot area is upto 320 sq.metres, the rainwater storage
(4) The owner(s)/occupier(s) shall maintain the rooftops and the groundwater recharging arrangements in healthy working condition.  
arrangements are not mandatory.) (ii) Group A2 Lodging Houses (ii) Group B Educational
'''
S
 
p (iv) Group C Medical hospital
'''102. Rainwater storage Arrangements.-('''1) Unless otherwise stipulated specifically in a Town Planning Scheme, workable rainwater storage arrangements shall be provided as an integral part of all new building constructions through the collection of rooftop rainwater for the following occupancies, namely:
disablenger
 
(i) Group A1                         Residential                 (In the case of single family residential buildings, if the total floor area of   the building isupto 150  
                                                                                      sq.metres and if the plot area is upto 320 sq.metres, the rainwater storage arrangements are not                                                                                                                                                                                                                                                                                  
                                                                                            mandatory.)
 
(ii) Group A2                   Lodging Houses  
 
(iii) Group B                       Educational
 
(iv) Group C Medical/hospital

Latest revision as of 04:17, 25 January 2019


(b) Number of floors shall be limited to two & a stair room;

(c) The minimum distance between buildings shall not be less than 1.50 metres;

(d) Minimum front open space of 1.50 metres shall be provided exclusively for each unit;

(e) A toilet shall be provided for each unit; with necessary leach pit or septic tank, which may be common.


100. In the case of construction/developments other than huts made by Tribal people in their land inside or outside a cluster of houses/settlement; the Panchayat may provide necessary assistance and guidelines so as to conform to the guidelines in the Rule 99, and also give necessary technical and infrastructural support as far as possible; and number the houses.


CHAPTER XVI
RAIN WATER HARVESTING

101. Groundwater recharging arrangements.- (1) Unless otherwise stipulated specifically in a Town Planning Scheme, workable groundwater recharging arrangement shall be provided as an integral part of all new building constructions through collection of rooftop rainwater:


Provided that, the groundwater recharging arrangements are not mandatory for thatched buildings and for single family residential buildings if the total floor area is upto 150 sq.metres and if the total plot area is upto 320 sq.metres;

(2) The components of workable groundwater recharging arrangements as stipulated in sub rule (1) above, shall include:


(i) Roof gutters

(ii) Down pipe

(iii) Filter unit

(iv) Recharge well or Recharge pond or Percolation pit:

Provided that, open well or pond within the plot can be used as recharge components as mentioned in item (iv) above:

Provided further that, filter unit as mentioned in item (iii) shall be mandatory only in situations where rainwater is recharged directly to the groundwater through open wells, ponds and the like. (3) In exceptional cases such as water logging or impermeable subsoil conditions to considerable depths, the groundwater recharging arrangements for building constructions need not be made mandatory.

(4) The owner(s)/occupier(s) shall maintain the rooftops and the groundwater recharging arrangements in healthy working condition.

102. Rainwater storage Arrangements.-(1) Unless otherwise stipulated specifically in a Town Planning Scheme, workable rainwater storage arrangements shall be provided as an integral part of all new building constructions through the collection of rooftop rainwater for the following occupancies, namely:

(i) Group A1 Residential (In the case of single family residential buildings, if the total floor area of the building isupto 150

                                                                                     sq.metres and if the plot area is upto 320  sq.metres, the rainwater  storage arrangements are not                                                                                                                                                                                                                                                                                    
                                                                                            mandatory.)  


(ii) Group A2 Lodging Houses

(iii) Group B Educational

(iv) Group C Medical/hospital