Panchayat:Repo18/vol1-page0832: Difference between revisions

From Panchayatwiki
No edit summary
No edit summary
Line 1: Line 1:
8. Maximum height of building in metres[ as per rule 2(1)(ba)] :
8. Maximum height of building in metres[ as per rule 2(1)(ba)] :


9. If the application is for regularisation  
9. If the application is for regularisation  
  (i) Whether completed or not:  
 
  (ii) If not completed, the stage of construction :
:(i) Whether completed or not:  
 
:(ii) If not completed, the stage of construction :
   
   
10. Details of Permit / Approved Plan already obtained:  
10. Details of Permit / Approved Plan already obtained:  
   
   
11. Name and address of the Developer if any:
11. Name and address of the Developer if any:


12. Details of fee paid-
12. Details of fee paid-
  (i) Amount (in Rupees)
:(i) Amount (in Rupees)
  (ii) Number and date of receipt  
:(ii) Number and date of receipt  


13. ##|Details of ownership documents, drawings,
13. ##|Details of ownership documents, drawings,
    certificates etc. as specified in these Rules)
certificates etc. as specified in these Rules)


                                                                                                  <big>DECARATION</big>
<center>
  l.................................................... hereby declare that, the measurements, specifications and other details and specifications mentioned above are correct, complete and true to the best of my knowledge and belief and that I shall abide by the approved plan and the provisions in the act and rules in undertaking the construction.
===DECARATION===
</center>
l.................................................... hereby declare that, the measurements, specifications and other details and specifications mentioned above are correct, complete and true to the best of my knowledge and belief and that I shall abide by the approved plan and the provisions in the act and rules in undertaking the construction.
   
   
                                                                                                                                                                  Signature of the Applicant with name
{|width="100%"
Place:
|width = "75%" | || Signature of the Applicant with name
Date :  
|}
 
Place:
Date :  


                                                                                                <big>CERTIFICATE</big>
<center>
===CERTIFICATE===
</center>
   
   
Certified that, the site plan is prepared after verification of the ownership document and the site and the measurements shown are found to be correct.
Certified that, the site plan is prepared after verification of the ownership document and the site and the measurements shown are found to be correct.
                                                                                                                  Signature  
{| width="100%"
                                                                                                                  Name:  
|width = "75%" |
                                                                                                                  Register Number:  
|width="25%" | Signature  
                                                                                                                  Address:  
|-
                                                                                                  <small>(Registered Architects Building Designer / Engineers Town Planners Supervisor)</small>  
| ||Name:  
Place:  
|-
Date :
| ||Register Number:  
|-
| ||Address:  
|}
<div class="floatright"> <small>(Registered Architects Building Designer / Engineers Town Planners Supervisor)</small> </div>
Place:  
 
Date :
                                                                    
                                                                    


                                                                                                          <big>CERTIFICATE</big>  
<center>
Certified that the building plan is prepared in accordance with the provisions of the Kerala Panchayat Building Rules, 2011, Kerala Panchayat Raj 1994 and the provisions contained in the sanctioned Town Planning Schemes.
===CERTIFICATE===
                                                                                                                      Signature Name:   
</center>
                                                                                                                      Register Number:  
Certified that the building plan is prepared in accordance with the provisions of the Kerala Panchayat Building Rules, 2011, Kerala Panchayat Raj 1994 and the provisions contained in the sanctioned Town Planning Schemes.
                                                                                                                      Address:  
{| width="100%"
                                                                                                      <small>(Registered Architects Building Designer / Engineers Town Planners Supervisor)</small>  
|width = "75%" |
Place:  
|width="25%" | Signature Name:   
  Date :
|-
| || Register Number:  
|-
| || Address:  
|}
<div class="floatright"> <small>(Registered Architects Building Designer / Engineers Town Planners Supervisor)</small> </div>
Place:  
 
Date :
 
<center>
===UNDERTAKING===
</center>
I................................... hereby undertake that the building construction / land development will be carried on being carried on was carried on as per the approved plan and permit in accordance with the rules in force.
{| width="100%"
|width = "75%" |
|width="25%" | Signature Name:
|-
| || Register Number:
|-
|-
| || Address:
|}
<div class="floatright"> <small>(Registered Architects Building Designer / Engineers Town Planners Supervisor)</small> </div>
Place:  


                                                                                                          <big>UNDERTAKING</big>
Date :
|................................... hereby undertake that the building construction / land development will be carried on being carried on was carried on as per the approved plan and permit in accordance with the  rules in force.
                                                                                                                                                                        Signature Name:
                                                                                                                                                                        Register Number:
                                                                                                                                                                        Address:
                                                                                                        <small>(Registered Architects Building Designer / Engineers Town Planners Supervisor)</small>
Place:
Date :

Revision as of 10:55, 21 January 2018

8. Maximum height of building in metres[ as per rule 2(1)(ba)] :

9. If the application is for regularisation

(i) Whether completed or not:
(ii) If not completed, the stage of construction :

10. Details of Permit / Approved Plan already obtained:

11. Name and address of the Developer if any:

12. Details of fee paid-

(i) Amount (in Rupees)
(ii) Number and date of receipt

13. ##|Details of ownership documents, drawings, certificates etc. as specified in these Rules)

DECARATION

l.................................................... hereby declare that, the measurements, specifications and other details and specifications mentioned above are correct, complete and true to the best of my knowledge and belief and that I shall abide by the approved plan and the provisions in the act and rules in undertaking the construction.

Signature of the Applicant with name

Place: Date :

CERTIFICATE

Certified that, the site plan is prepared after verification of the ownership document and the site and the measurements shown are found to be correct.

Signature
Name:
Register Number:
Address:
(Registered Architects Building Designer / Engineers Town Planners Supervisor)

Place:

Date :


CERTIFICATE

Certified that the building plan is prepared in accordance with the provisions of the Kerala Panchayat Building Rules, 2011, Kerala Panchayat Raj 1994 and the provisions contained in the sanctioned Town Planning Schemes.

Signature Name:
Register Number:
Address:
(Registered Architects Building Designer / Engineers Town Planners Supervisor)

Place:

Date :

UNDERTAKING

I................................... hereby undertake that the building construction / land development will be carried on being carried on was carried on as per the approved plan and permit in accordance with the rules in force.

Signature Name:
Register Number:
Address:
(Registered Architects Building Designer / Engineers Town Planners Supervisor)

Place:

Date :