Panchayat:Repo18/vol2-page0357: Difference between revisions

From Panchayatwiki
No edit summary
mNo edit summary
 
Line 1: Line 1:


                                          '''Annexure-lI'''<br>
                                   
'''List of petroleum and chemical products permitted for storage in [CRZ except CRZ-l(A)]'''<br>
(i) the total plot size shall not be less than 0.4 hectares and the total covered area on all floors shall not exceed 33 percent of the plot size i.e., the Floor Space Index shall not exceed 0.33 and the open area shall be suitably landscaped with appropriate vegetal cover;
(i) Crude oil;<br>
(ii) Liquefied Petroleum Gas;<br>
(iii) Motor spirit;<br>
(iv) Kerosene,<br>
(v) Aviation fuel;<br>
(vi) High speed diesel;<br>
(vii) Lubricating oil;<br>
(viii) Butane;<br>
(ix) Propane;<br>
(x) Compressed Natural Gas;


(xi) Naphtha;<br>
(j) the construction shall be consistent with the surrounding landscape and local architectural style;
(xii). Furnace oil;<br>
 
(xiii) Low Sulphur Heavy Stock;<br>
(k) the overall height of construction upto the highest ridge of the roof, shall not exceed 9 metres and the construction shall not be more than two floors (ground floor plus one upper floor);
(xiv) Liquefied Natural Gas;<br>
 
(XV) Fertilizers and raw materials for manufacture offertilizers. <br>
(l) groundwater shall not be tapped within 200metre of the High Tide Line; within the 200metre 500metre zone it can be tapped only with the concurrence of the Central or State Ground Water Board;
 
(m) extraction of sand, leveling or digging of sandy stretches except for structural foundation of building, swimming pool shall not be permitted within 500 metres of the High Tide Line;
 
(n) the quality of treated effluents, solid wastes, emissions and noise levels and the like, from the project area must conform to the standards laid down by the competent authorities including the Central or State Pollution Control Board and under the Environment (Protection) Act, 1986;
 
(0) necessary arrangements for the treatment of the effluents and solid wastes must be made and it must be ensured that the untreated effluents and solid wastes are not discharged into the water or on the beach; and no effluent or solid waste shall be discharged on the beach;
 
(p) to allow public access to the beach, atleast a gap of 20metres width shall be provided between any two hotels or beach resorts; and in no case shall gaps be less than 500metres apart; and
 
(q) if the project involves diversion of forestland for non-forest purposes, clearance as required under the Forest (Conservation) Act, 1980 shall be obtained and the requirements of other Central and State laws as applicable to the project shall be met with; and
 
(r) approval of the State or Union territory Tourism Department shall be obtained.
 
II. In ecologically sensitive areas (such as marine parks, mangroves, coral reefs, breeding and spawning grounds of fish, wildlife habitats and such other area as may be notified by the Central or State Government Union territories) construction of beach resorts or hotels shall not be permitted
 
{{center|''Annexure-IV''}}
{{center|''Form-l for seeking clearance for project attracting CRZ notification'' }}
Basic information:
Name of the Project
:Location or site alternatives under consideration:
:Size of the project (in terms of total area) :
:CRZ classification of the area:
:Expected cost of the project:
:Contact Information:
''(11) Activity''
: 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, and the like)


'''Annexure-llI'''<br>
'''Guidelines for development of beach resorts or hotels in the designated areas of CRZ-Illand CRZ-ll for occupation of tourist or visitors with prior approval of the Ministry of Environment and Forests''' <br>
I. Construction of beach resorts or hotels with prior approval of MoEF in designated areas of CRZ-II and III for occupation of tourist or visitors shall be subject to the following conditions, namely:- <br>
(a) The project proponent shall not undertake any construction within 200 metres in the landward side of HighTide Line and within the area between Low Tide Line and HighTide Line; <br>
(b) The proposed constructions shall be beyond the hazard line or 200mts from the High Tide Line whichever is more; <br>
(c) live fencing and barbed wire fencing with vegetative cover may be allowed around private properties subject to the Condition that such fencing shall in no way hamper public access to the beach; <br>
(d) no flattening of sand dunes shall be carried out;<br>
(e) no permanent structures for Sports facilities shall be permitted except construction of goal posts, net posts and lamp posts; <br>
(f) Construction of basement may be allowed subject to the condition that no objection certification is obtained from the State Ground Water Authority to the effect that such construction will not adversely affect fee flow of groundwater in that area; <br>
(g) the State Ground Water Authority shall take into consideration the guidelines issued by Central Government before granting such no objection certificate; <br>
(h) though no Construction is allowed in the no development zone for the purposes of calculation of Floor Space Index, the area of entire plot including the portion which falls within the no development zone shall be taken into account;
{{Create}}
{{Create}}

Latest revision as of 06:57, 25 January 2019


(i) the total plot size shall not be less than 0.4 hectares and the total covered area on all floors shall not exceed 33 percent of the plot size i.e., the Floor Space Index shall not exceed 0.33 and the open area shall be suitably landscaped with appropriate vegetal cover;

(j) the construction shall be consistent with the surrounding landscape and local architectural style;

(k) the overall height of construction upto the highest ridge of the roof, shall not exceed 9 metres and the construction shall not be more than two floors (ground floor plus one upper floor);

(l) groundwater shall not be tapped within 200metre of the High Tide Line; within the 200metre 500metre zone it can be tapped only with the concurrence of the Central or State Ground Water Board;

(m) extraction of sand, leveling or digging of sandy stretches except for structural foundation of building, swimming pool shall not be permitted within 500 metres of the High Tide Line;

(n) the quality of treated effluents, solid wastes, emissions and noise levels and the like, from the project area must conform to the standards laid down by the competent authorities including the Central or State Pollution Control Board and under the Environment (Protection) Act, 1986;

(0) necessary arrangements for the treatment of the effluents and solid wastes must be made and it must be ensured that the untreated effluents and solid wastes are not discharged into the water or on the beach; and no effluent or solid waste shall be discharged on the beach;

(p) to allow public access to the beach, atleast a gap of 20metres width shall be provided between any two hotels or beach resorts; and in no case shall gaps be less than 500metres apart; and

(q) if the project involves diversion of forestland for non-forest purposes, clearance as required under the Forest (Conservation) Act, 1980 shall be obtained and the requirements of other Central and State laws as applicable to the project shall be met with; and

(r) approval of the State or Union territory Tourism Department shall be obtained.

II. In ecologically sensitive areas (such as marine parks, mangroves, coral reefs, breeding and spawning grounds of fish, wildlife habitats and such other area as may be notified by the Central or State Government Union territories) construction of beach resorts or hotels shall not be permitted

Annexure-IV
Form-l for seeking clearance for project attracting CRZ notification

Basic information:

Name of the Project
Location or site alternatives under consideration:
Size of the project (in terms of total area) :
CRZ classification of the area:
Expected cost of the project:
Contact Information:

(11) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, and the like)


വർഗ്ഗം:റെപ്പോയിൽ സൃഷ്ടിക്കപ്പെട്ട ലേഖനങ്ങൾ