Panchayat:Repo18/vol2-page0225: Difference between revisions
Nandakumar (talk | contribs) No edit summary |
Sajithomas (talk | contribs) No edit summary |
||
Line 36: | Line 36: | ||
3. I also certify that the arrangements made for ventilation/air-conditioning systems are satisfactory. | 3. I also certify that the arrangements made for ventilation/air-conditioning systems are satisfactory. | ||
{{ | {{approved}} |
Latest revision as of 06:56, 30 May 2019
14. Suitability of the place where the cinema exhibitions are proposed to be given.
15. Adequacy of the existing place for the exhibition of cinema films in the locality.
16. Population of the place according to the latest census figures.
Place:
(Signature of the Applicant)
Date:
FORM B
(See Rule 6)
PERMISSION ISSUED UNDERRULE 6 OF THE KERALA CINEMA (REGULATION) RULES, 1988
In exercise of the powers conferred by rule 6 of the Kerala Cinemas (Regulation) Rules,
1988.
I, ..................................... Commissioner, Corporation/Municipality/Panchayat Executive Officer of ...................................... do hereby grant this permission to Shri/Smt. ..................Son/daughter/wife of............. aged................ Taluk/Town .............. District .............. for constructing/reconstructing/locating a permanent/temporary/.................. cinema use as per the approved plan in the land belonging to him/her/Shri/Smt................. bearing Sy. No. ................... Village/Ward.............. Taluk/ Town.............. District ............ measuring about............... Sq. metres and bounded as under:-
(Please give here the description of the site)
This permission is valid for a period of one year in the case of permanent building and three months in respect of temporary building from the date specified below for the completion of the construction of the building.
Given under my hand this the ............ day of............... 20..................
FORM C
See Rule 12(3)(a)) CERTIFICATE OF STRUCTURAL SOUNDNESS OF ............. THEATRE
Certified that building of ...............theatre a......... is structurally sound for the conduct of cinematographs for the period from .................
Office of the Executive Engineer Executive Engineer
Date : ..............................
FORM D
[See Rule 12(3)(b)]
GOVERNMENT OF KERALA
CERTIFICATE OF SUITABILITY OF THE ENCLOSURE, CINEMATOGRAPH APPARATUS AND PLANT AND ELECTRICAL INSTALLATION, FIRE FIGHTING APPLIANCES ANDFIRE PRECAUTIONARY MEASURES AND VENTILATION/AIR CONDITIONING SYSTEM
Certificate No....................................... Date ........................
Under Rule 12 (3) (b) of Kerala Cinema (Regulation) Rules, 19.......... I certify that the enclosure, the cinematograph apparatus and plant and the electrical installation including the ventilation/air conditioning system of the Cinema known as- - - - - - - and more particularly described below of which Sri......... is the Managing Director/ Proprietor and Shri............ is the Managing Director/Proprietor and Shri........... is the Manager or person in-charge and Shri......... is/are licensed cinema operators in charge at.............. On ...... ....... are in order for both silent and talkies films.
2. I also certify that the rules regarding the fire fighting appliances and fire precautionary ۔۔۔۔۔۔۔۔۔۔۔۔۔۔۔۔ measures in the licensed premises have been complied with.
3. I also certify that the arrangements made for ventilation/air-conditioning systems are satisfactory.