<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>http://panchayatwiki.lsgkerala.gov.in/index.php?action=history&amp;feed=atom&amp;title=Panchayat%3ARepo18%2Fvol2-page0210</id>
	<title>Panchayat:Repo18/vol2-page0210 - Revision history</title>
	<link rel="self" type="application/atom+xml" href="http://panchayatwiki.lsgkerala.gov.in/index.php?action=history&amp;feed=atom&amp;title=Panchayat%3ARepo18%2Fvol2-page0210"/>
	<link rel="alternate" type="text/html" href="http://panchayatwiki.lsgkerala.gov.in/index.php?title=Panchayat:Repo18/vol2-page0210&amp;action=history"/>
	<updated>2026-04-13T14:04:11Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.40.1</generator>
	<entry>
		<id>http://panchayatwiki.lsgkerala.gov.in/index.php?title=Panchayat:Repo18/vol2-page0210&amp;diff=12505&amp;oldid=prev</id>
		<title>Sajithomas at 06:08, 30 May 2019</title>
		<link rel="alternate" type="text/html" href="http://panchayatwiki.lsgkerala.gov.in/index.php?title=Panchayat:Repo18/vol2-page0210&amp;diff=12505&amp;oldid=prev"/>
		<updated>2019-05-30T06:08:27Z</updated>

		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 06:08, 30 May 2019&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l13&quot;&gt;Line 13:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 13:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&amp;#039;&amp;#039;&amp;#039;14.&amp;#039;&amp;#039;&amp;#039; On receipt of the application for licence, as required in Rule 13, the Licensing Authority shall, within 2 Weeks from the date of its receipt, issue a licence in duplicate in Form &amp;#039;E&amp;#039; annexed to these rules or refuse to issue a licence for reasons to be recorded in writing and communicate the same to the applicant. A copy of the approved plans and drawing shall be attached to the licence. The electrical certificate shall also be delivered to the licensee. &amp;lt;br&amp;gt;&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&amp;#039;&amp;#039;&amp;#039;14.&amp;#039;&amp;#039;&amp;#039; On receipt of the application for licence, as required in Rule 13, the Licensing Authority shall, within 2 Weeks from the date of its receipt, issue a licence in duplicate in Form &amp;#039;E&amp;#039; annexed to these rules or refuse to issue a licence for reasons to be recorded in writing and communicate the same to the applicant. A copy of the approved plans and drawing shall be attached to the licence. The electrical certificate shall also be delivered to the licensee. &amp;lt;br&amp;gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&amp;#039;&amp;#039;&amp;#039;15.&amp;#039;&amp;#039;&amp;#039; No licence shall be issued by the Licensing Authority in the absence of the electrical certificate in Form &amp;#039;D&amp;#039; and the structural soundness certificate in Form &amp;#039;C&amp;#039; annexed to these rules.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot;&gt;&lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&amp;#039;&amp;#039;&amp;#039;15.&amp;#039;&amp;#039;&amp;#039; No licence shall be issued by the Licensing Authority in the absence of the electrical certificate in Form &amp;#039;D&amp;#039; and the structural soundness certificate in Form &amp;#039;C&amp;#039; annexed to these rules.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;{{&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;create&lt;/del&gt;}}&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;{{&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;approved&lt;/ins&gt;}}&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Sajithomas</name></author>
	</entry>
	<entry>
		<id>http://panchayatwiki.lsgkerala.gov.in/index.php?title=Panchayat:Repo18/vol2-page0210&amp;diff=4657&amp;oldid=prev</id>
		<title>Nandakumar at 06:44, 1 February 2018</title>
		<link rel="alternate" type="text/html" href="http://panchayatwiki.lsgkerala.gov.in/index.php?title=Panchayat:Repo18/vol2-page0210&amp;diff=4657&amp;oldid=prev"/>
		<updated>2018-02-01T06:44:12Z</updated>

		<summary type="html">&lt;p&gt;&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 06:44, 1 February 2018&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l1&quot;&gt;Line 1:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&#039;&#039;&#039;210 THE KERALA CINEMAS REGULATION RULES, 1988 Rule 13&#039;&#039;&#039;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;(d) a certificate from the Divisional Officer, Fire Force in respect of fire protection measures in case of multiple, multi-storeyed and air-conditioned theatres.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&amp;lt;br&amp;gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;(d) a certificate from the Divisional Officer, Fire Force in respect of fire protection measures in case of multiple, multi-storeyed and air-conditioned theatres.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;(4) Every application for a certificate in Form &#039;C&#039; shall be made to the Executive Engineer quoting the permission number and date of issue of the permission by the licensing authority. The Executive Engineer shall promptly acknowledge the receipt of the application, conduct inspection and if he is satisfied about the structural Soundness of the building shall issue the certificate in Form &#039;C&#039; within One month after &#039;receipt of the application&#039;. The validity of such certificate shall be for three years in the case of permanent building, and up to a maximum of one year and a minimum of six months in the case of temporary buildings.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&amp;lt;br&amp;gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;−&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;(4) Every application for a certificate in Form &#039;C&#039; shall be made to the Executive Engineer quoting the permission number and date of issue of the permission by the licensing authority. The Executive Engineer shall promptly acknowledge the receipt of the application, conduct inspection and if he is satisfied about the structural Soundness of the building shall issue the certificate in Form &#039;C&#039; within One month after &#039;receipt of the application&#039;. The validity of such certificate shall be for three years in the case of permanent building, and up to a maximum of one year and a minimum of six months in the case of temporary buildings. Explanation:- For the purpose of issuing a certificate under this rule, the Executive Engineer shall have power to make an inspection of the building including the right to probe any portion of the structure and to call upon the applicant for furnishing the license with detailed particulars regarding the quality and proportion of the materials used in the construction of the building. (5) Every application for a certificate in Form &#039;D&#039; shall be made to the Chief Electrical Inspector or his nominee along with necessary documents and the treasury receipt for the inspection fee as required in Rules 31 and 32. In the application the applicant shall quote the permission number and date of issue of the permission by the Licensing Authority. The receipt of the application shall be promptly acknowledged. The Chief Electrical Inspector or his nominee shall arrange for the inspection of enclosure, cinematograph apparatus, plant and electrical installations, &lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;airConditioning &lt;/del&gt;installations and on inspection if satisfied, give to the applicant a certificate in Form &#039;D&#039;annexed to these rules within a period of one month from the date of application. A duplicate of the electrical certificate may be granted on payment of a fee of Rupees 25. The validity of the &#039;D&#039; certificate shall be for the same period as for the &#039;C&#039; certificate. (6) Every application for a certificate from the Health Officer shall be made to the Health Officer having jurisdiction over the area. The receipt of the application shall be promptly acknowledged by the Health Officer. He shall arrange for the inspection and issuance of the certificate within one month from the date of receipt of the application. (7) Where certificate in Form &#039;C&#039; and &#039;D&#039; are given for lesser period than provided in these rules the reasons therefor shall be communicated to the applicant. 13. After obtaining the certificates referred to in Rule 12, the applicant shall submit his application for licence under Section 3 of the Act in writing to the Licensing Authority. The application shall be accompanied by(i) the certificates issued by the Executive Engineer, the Chief Electrical Inspector or his nominee concerned and the Health Officer; (ii) a certificate from the Films Division of the Government of India that all arrangements have been made for the supply of approved films; (iii) documentary evidence pertaining to the ownership and possession of the site, building and equipment and if he is not the owner, documentary evidence to show that he is in lawful possession of the site, building and equipments to the satisfaction of the Licensing Authority; (iv) receipt for the payment of licence fees at the rate prescribed under sub-rule (2) of Rule 19; and (v) the certificate from the Divisional Officer (Fire Force) in the case of multiple, multistoreyed and air-conditioned theatres. 14. On receipt of the application for licence, as required in Rule 13, the Licensing Authority shall, within 2 Weeks from the date of its receipt, issue a licence in duplicate in Form &#039;E&#039; annexed to these rules or refuse to issue a licence for reasons to be recorded in writing and communicate the same to the applicant. A copy of the approved plans and drawing shall be attached to the licence. The electrical certificate shall also be delivered to the licensee. 15. No licence shall be issued by the Licensing Authority in the absence of the electrical certificate in Form &#039;D&#039; and the structural soundness certificate in Form &#039;C&#039; annexed to these rules.&lt;/div&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&#039;&#039;&#039;&lt;/ins&gt;Explanation:&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&#039;&#039;&#039;&lt;/ins&gt;- For the purpose of issuing a certificate under this rule, the Executive Engineer shall have power to make an inspection of the building including the right to probe any portion of the structure and to call upon the applicant for furnishing the license with detailed particulars regarding the quality and proportion of the materials used in the construction of the building. &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&amp;lt;br&amp;gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;(5) Every application for a certificate in Form &#039;D&#039; shall be made to the Chief Electrical Inspector or his nominee along with necessary documents and the treasury receipt for the inspection fee as required in Rules 31 and 32. In the application the applicant shall quote the permission number and date of issue of the permission by the Licensing Authority. The receipt of the application shall be promptly acknowledged. The Chief Electrical Inspector or his nominee shall arrange for the inspection of enclosure, cinematograph apparatus, plant and electrical installations, &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;air-Conditioning &lt;/ins&gt;installations and on inspection if satisfied, give to the applicant a certificate in Form &#039;D&#039;annexed to these rules within a period of one month from the date of application. A duplicate of the electrical certificate may be granted on payment of a fee of Rupees 25. The validity of the &#039;D&#039; certificate shall be for the same period as for the &#039;C&#039; certificate.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&amp;lt;br&amp;gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;(6) Every application for a certificate from the Health Officer shall be made to the Health Officer having jurisdiction over the area. The receipt of the application shall be promptly acknowledged by the Health Officer. He shall arrange for the inspection and issuance of the certificate within one month from the date of receipt of the application. &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&amp;lt;br&amp;gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;(7) Where certificate in Form &#039;C&#039; and &#039;D&#039; are given for lesser period than provided in these rules the reasons therefor shall be communicated to the applicant. &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&amp;lt;br&amp;gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&#039;&#039;&#039;&lt;/ins&gt;13.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&#039;&#039;&#039; &lt;/ins&gt;After obtaining the certificates referred to in Rule 12, the applicant shall submit his application for licence under Section 3 of the Act in writing to the Licensing Authority. The application shall be accompanied by&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;-&amp;lt;br&amp;gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;(i) the certificates issued by the Executive Engineer, the Chief Electrical Inspector or his nominee concerned and the Health Officer; &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&amp;lt;br&amp;gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;(ii) a certificate from the Films Division of the Government of India that all arrangements have been made for the supply of approved films; &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&amp;lt;br&amp;gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;(iii) documentary evidence pertaining to the ownership and possession of the site, building and equipment and if he is not the owner, documentary evidence to show that he is in lawful possession of the site, building and equipments to the satisfaction of the Licensing Authority; &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&amp;lt;br&amp;gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;(iv) receipt for the payment of licence fees at the rate prescribed under sub-rule (2) of Rule 19; and &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&amp;lt;br&amp;gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;(v) the certificate from the Divisional Officer (Fire Force) in the case of multiple, multistoreyed and air-conditioned theatres. &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&amp;lt;br&amp;gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&#039;&#039;&#039;&lt;/ins&gt;14.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&#039;&#039;&#039; &lt;/ins&gt;On receipt of the application for licence, as required in Rule 13, the Licensing Authority shall, within 2 Weeks from the date of its receipt, issue a licence in duplicate in Form &#039;E&#039; annexed to these rules or refuse to issue a licence for reasons to be recorded in writing and communicate the same to the applicant. A copy of the approved plans and drawing shall be attached to the licence. The electrical certificate shall also be delivered to the licensee. &lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&amp;lt;br&amp;gt;&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&#039;&#039;&#039;&lt;/ins&gt;15.&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&#039;&#039;&#039; &lt;/ins&gt;No licence shall be issued by the Licensing Authority in the absence of the electrical certificate in Form &#039;D&#039; and the structural soundness certificate in Form &#039;C&#039; annexed to these rules.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-side-deleted&quot;&gt;&lt;/td&gt;&lt;td class=&quot;diff-marker&quot; data-marker=&quot;+&quot;&gt;&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;{{create}}&lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Nandakumar</name></author>
	</entry>
	<entry>
		<id>http://panchayatwiki.lsgkerala.gov.in/index.php?title=Panchayat:Repo18/vol2-page0210&amp;diff=286&amp;oldid=prev</id>
		<title>Manojk: Manojk എന്ന ഉപയോക്താവ് Panchayat:Repo18//vol2-page0210 എന്ന താൾ Panchayat:Repo18/vol2-page0210 എന്നാക്കി മാറ്റിയിരിക്കുന്നു</title>
		<link rel="alternate" type="text/html" href="http://panchayatwiki.lsgkerala.gov.in/index.php?title=Panchayat:Repo18/vol2-page0210&amp;diff=286&amp;oldid=prev"/>
		<updated>2018-01-04T07:44:14Z</updated>

		<summary type="html">&lt;p&gt;Manojk എന്ന ഉപയോക്താവ് &lt;a href=&quot;/Panchayat:Repo18//vol2-page0210&quot; title=&quot;Panchayat:Repo18//vol2-page0210&quot;&gt;Panchayat:Repo18//vol2-page0210&lt;/a&gt; എന്ന താൾ &lt;a href=&quot;/Panchayat:Repo18/vol2-page0210&quot; title=&quot;Panchayat:Repo18/vol2-page0210&quot;&gt;Panchayat:Repo18/vol2-page0210&lt;/a&gt; എന്നാക്കി മാറ്റിയിരിക്കുന്നു&lt;/p&gt;
&lt;table style=&quot;background-color: #fff; color: #202122;&quot; data-mw=&quot;interface&quot;&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;1&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;1&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 07:44, 4 January 2018&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-notice&quot; lang=&quot;en&quot;&gt;&lt;div class=&quot;mw-diff-empty&quot;&gt;(No difference)&lt;/div&gt;
&lt;/td&gt;&lt;/tr&gt;&lt;/table&gt;</summary>
		<author><name>Manojk</name></author>
	</entry>
	<entry>
		<id>http://panchayatwiki.lsgkerala.gov.in/index.php?title=Panchayat:Repo18/vol2-page0210&amp;diff=273&amp;oldid=prev</id>
		<title>Subhash: &#039;&#039;&#039;&#039;210 THE KERALA CINEMAS REGULATION RULES, 1988 Rule 13&#039;&#039;&#039; (d) a certificate from the Divisional Officer, Fire Force in r...&#039; താൾ സൃഷ്ടിച്ചിരിക്കുന്നു</title>
		<link rel="alternate" type="text/html" href="http://panchayatwiki.lsgkerala.gov.in/index.php?title=Panchayat:Repo18/vol2-page0210&amp;diff=273&amp;oldid=prev"/>
		<updated>2018-01-04T07:41:57Z</updated>

		<summary type="html">&lt;p&gt;&amp;#039;&amp;#039;&amp;#039;&amp;#039;210 THE KERALA CINEMAS REGULATION RULES, 1988 Rule 13&amp;#039;&amp;#039;&amp;#039; (d) a certificate from the Divisional Officer, Fire Force in r...&amp;#039; താൾ സൃഷ്ടിച്ചിരിക്കുന്നു&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;&amp;#039;&amp;#039;&amp;#039;210 THE KERALA CINEMAS REGULATION RULES, 1988 Rule 13&amp;#039;&amp;#039;&amp;#039;&lt;br /&gt;
(d) a certificate from the Divisional Officer, Fire Force in respect of fire protection measures in case of multiple, multi-storeyed and air-conditioned theatres.&lt;br /&gt;
(4) Every application for a certificate in Form &amp;#039;C&amp;#039; shall be made to the Executive Engineer quoting the permission number and date of issue of the permission by the licensing authority. The Executive Engineer shall promptly acknowledge the receipt of the application, conduct inspection and if he is satisfied about the structural Soundness of the building shall issue the certificate in Form &amp;#039;C&amp;#039; within One month after &amp;#039;receipt of the application&amp;#039;. The validity of such certificate shall be for three years in the case of permanent building, and up to a maximum of one year and a minimum of six months in the case of temporary buildings. Explanation:- For the purpose of issuing a certificate under this rule, the Executive Engineer shall have power to make an inspection of the building including the right to probe any portion of the structure and to call upon the applicant for furnishing the license with detailed particulars regarding the quality and proportion of the materials used in the construction of the building. (5) Every application for a certificate in Form &amp;#039;D&amp;#039; shall be made to the Chief Electrical Inspector or his nominee along with necessary documents and the treasury receipt for the inspection fee as required in Rules 31 and 32. In the application the applicant shall quote the permission number and date of issue of the permission by the Licensing Authority. The receipt of the application shall be promptly acknowledged. The Chief Electrical Inspector or his nominee shall arrange for the inspection of enclosure, cinematograph apparatus, plant and electrical installations, airConditioning installations and on inspection if satisfied, give to the applicant a certificate in Form &amp;#039;D&amp;#039;annexed to these rules within a period of one month from the date of application. A duplicate of the electrical certificate may be granted on payment of a fee of Rupees 25. The validity of the &amp;#039;D&amp;#039; certificate shall be for the same period as for the &amp;#039;C&amp;#039; certificate. (6) Every application for a certificate from the Health Officer shall be made to the Health Officer having jurisdiction over the area. The receipt of the application shall be promptly acknowledged by the Health Officer. He shall arrange for the inspection and issuance of the certificate within one month from the date of receipt of the application. (7) Where certificate in Form &amp;#039;C&amp;#039; and &amp;#039;D&amp;#039; are given for lesser period than provided in these rules the reasons therefor shall be communicated to the applicant. 13. After obtaining the certificates referred to in Rule 12, the applicant shall submit his application for licence under Section 3 of the Act in writing to the Licensing Authority. The application shall be accompanied by(i) the certificates issued by the Executive Engineer, the Chief Electrical Inspector or his nominee concerned and the Health Officer; (ii) a certificate from the Films Division of the Government of India that all arrangements have been made for the supply of approved films; (iii) documentary evidence pertaining to the ownership and possession of the site, building and equipment and if he is not the owner, documentary evidence to show that he is in lawful possession of the site, building and equipments to the satisfaction of the Licensing Authority; (iv) receipt for the payment of licence fees at the rate prescribed under sub-rule (2) of Rule 19; and (v) the certificate from the Divisional Officer (Fire Force) in the case of multiple, multistoreyed and air-conditioned theatres. 14. On receipt of the application for licence, as required in Rule 13, the Licensing Authority shall, within 2 Weeks from the date of its receipt, issue a licence in duplicate in Form &amp;#039;E&amp;#039; annexed to these rules or refuse to issue a licence for reasons to be recorded in writing and communicate the same to the applicant. A copy of the approved plans and drawing shall be attached to the licence. The electrical certificate shall also be delivered to the licensee. 15. No licence shall be issued by the Licensing Authority in the absence of the electrical certificate in Form &amp;#039;D&amp;#039; and the structural soundness certificate in Form &amp;#039;C&amp;#039; annexed to these rules.&lt;/div&gt;</summary>
		<author><name>Subhash</name></author>
	</entry>
</feed>