<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>http://panchayatwiki.lsgkerala.gov.in/index.php?action=history&amp;feed=atom&amp;title=Panchayat%3ARepo18%2Fvol1-page0859</id>
	<title>Panchayat:Repo18/vol1-page0859 - Revision history</title>
	<link rel="self" type="application/atom+xml" href="http://panchayatwiki.lsgkerala.gov.in/index.php?action=history&amp;feed=atom&amp;title=Panchayat%3ARepo18%2Fvol1-page0859"/>
	<link rel="alternate" type="text/html" href="http://panchayatwiki.lsgkerala.gov.in/index.php?title=Panchayat:Repo18/vol1-page0859&amp;action=history"/>
	<updated>2026-04-16T01:39:03Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.40.1</generator>
	<entry>
		<id>http://panchayatwiki.lsgkerala.gov.in/index.php?title=Panchayat:Repo18/vol1-page0859&amp;diff=10432&amp;oldid=prev</id>
		<title>Animon: &#039; 10. Is there any Government orders, circulars, :.... any other form of communication against the plot/land or any constru...&#039; താൾ സൃഷ്ടിച്ചിരിക്കുന്നു</title>
		<link rel="alternate" type="text/html" href="http://panchayatwiki.lsgkerala.gov.in/index.php?title=Panchayat:Repo18/vol1-page0859&amp;diff=10432&amp;oldid=prev"/>
		<updated>2019-05-28T07:15:11Z</updated>

		<summary type="html">&lt;p&gt;&amp;#039; 10. Is there any Government orders, circulars, :.... any other form of communication against the plot/land or any constru...&amp;#039; താൾ സൃഷ്ടിച്ചിരിക്കുന്നു&lt;/p&gt;
&lt;p&gt;&lt;b&gt;New page&lt;/b&gt;&lt;/p&gt;&lt;div&gt;&lt;br /&gt;
10. Is there any Government orders, circulars, :....&lt;br /&gt;
any other form of communication against the plot/land or any construction works therein. (Specify Yes/No)&lt;br /&gt;
If Yes, furnish the details &lt;br /&gt;
&lt;br /&gt;
11. Any other details pertaining to or of relevance .........&lt;br /&gt;
to the plot and buildings therein (Specify Yes/No):&lt;br /&gt;
If Yes, furnish the details &lt;br /&gt;
&lt;br /&gt;
12. Checklist of enclosures to be furnished by the owner :&lt;br /&gt;
(3)&lt;br /&gt;
SI. Item of enclosures to be furnished by the owner&lt;br /&gt;
Applicability No. (1)&lt;br /&gt;
(2) (a) Receipt for payment of application fee, if any paid to the&lt;br /&gt;
Compulsory Grama Panchayat as per Rule 4 of these rules (b) (i) Four copies each of the floor plans, elevations and sections of the&lt;br /&gt;
Compulsory building(s) constructed, the site plan and wherever applicable, the service plans, parking plans and specifications drawn as provided in sub-rule (11) of rule 7 of the Building Rules, duly signed and certified&lt;br /&gt;
iding Rules duly signed and certified in the format given under sub-rule (2) of rule 3 of these Rules by the owner/by the licensee and if applicable, by the Structural Engineer who has issued the structural stability certificate.&lt;br /&gt;
(or) (ii) In the case of huts, four copies each of a site plan&lt;br /&gt;
showing the outline of the built-up area, the boundaries of the plot and nearby streets duly signed by the owner,&lt;br /&gt;
(or) (iii) In the case of constructions under approved Schemes&lt;br /&gt;
as mentioned in rule 72 of the Building Rules with total floor area of building up to 60 sq. metres and number of floors limited to two and a stair room, where the construction has to be done by individuals separately,&lt;br /&gt;
grysoto four copies each of a site plan showing the outline of the built-up area, the boundaries of the plot and nearby&lt;br /&gt;
betulosa wiosce cei streets, duly signed by the owner.&lt;br /&gt;
Note.– (1) the unauthorised construction applied for regularization shall be indicated in red colour outline in the drawings.&lt;br /&gt;
(2) The following shall be the format for Certificate on the drawings by:-&lt;br /&gt;
(i) the owner: &amp;quot;Certified that this is the drawing(s) having reference to the details furnished in Form 1-A and documents enclosed along with.&amp;quot;&lt;br /&gt;
ia (ii) the Licensee: &amp;quot;Certified that this is the drawing(s) having reference to the details furnished in Form I-A and documents enclosed along with and that the details and measurements therein conform to actual constructions made in the site.&amp;quot;&lt;br /&gt;
&amp;quot;Certified further that, the unauthorised building(s) under reference is/are structurally stable&amp;quot; (strike out this certification if the unauthorised building(s) is high-rise building and/or telecommunication tower).&lt;br /&gt;
Beri Also certified that I fulfil the necessary qualifications and experience as specified in the Building Rules and these Rules.&lt;br /&gt;
(iii) the Structural Engineer: &amp;quot;Certified that the unauthorised high-rise building(s)/unauthorised telecommunication tower(s)/the building above which such unauthorised telecommunication tower is erected (strike out which is/are not applicable) as per the drawings and Form I-A enclosed herewith is/ are structurally stable. (this certification is required only if the unauthorised construction is a high-rise building and/or telecommunication tower). Certified further that I fulfil necessary qualifications and experience as specified in the Building Rules and these Rules. (C) Documents to prove ownership of land&lt;/div&gt;</summary>
		<author><name>Animon</name></author>
	</entry>
</feed>